
Installation ![]() |
Installation (no staples can be used)Download Installation Instructions as PDF
ROOF PITCH: RoofTopGuard II should not be used on slopes less than 2 : 12. LAYING METHOD: RoofTopGuard II is laid horizontally (parallel) to the eave with the printed side up, and with 4" horizontal laps and 6" vertical laps. (The use of a slip sheet is not required underneath metal roofing.) TILE INSTALLATION: For tile installations use a pressure sensitive, double sided tape such as MFM. SEALANT: Where seams or joints require sealant or adhesive, use only a high quality, low solvent asbestos free plastic roofing cement meeting ASTM D-4586 Type 1 (Asbestos Free), Spec SS-153 Type 1 (Asbestos Free). In areas subject to wind-driven rain where the underlayment will be left exposed to the weather for an extended period of time, seal all seams with a butyl rubber, urethane, or EPDM based caulk or tape sealant. SITE PROTECTION: Prior to loading the roofing materials onto the RoofTopGuard product, it is recommended that a roof jack, with planks, toe boards, or a strong platform be secured to the underlying roofing deck to prevent slippage of stored materials on steep sloped roofs (greater than 4 : 12 pitch). See OSHA regulations (Standard 29 CFR), fall protection systems criteria and practices – 1926.502. FINAL INSTALLATION: Installing final roofing within 6 months from initial underlayment application is recommended.
|