SPECIFICATIONS
Download Specifications as PDF
1. Classification ROOF COVERING AND ROOF DECK CONSTRUCTION-Underlayment SHINGLES, ROOF TILES & ROOF COVERINGS - 07300
2. Product Name RoofTopGuard II, High Performance Roofing Underlayment
3. Manufacturer RKW Finland Ltd. PO Box 22, FIN-28601 PORI, Finland • www.rooftopguard.com
4. Product Description RoofTopGuard II is a 5-ply, 100% asphalt and asbestos free, high strength performance roofing underlayment used on stoop sloped roofs beneath composite, metal, clay, concrete, slate, wood and other roofing materials. RoofTopGuard II is a woven HDPE with a polyethylene film laminated with black LDPE on one side and in addition a nonwoven polypropylene layer is laminated with LDPE on the other side of the woven HDPE. RoofTopGuard II is approved as an alternate replacement for Type 15 or Type 30 asphalt roofing felt. RoofTopGuard II measures 60" wide and comes in 200' rolls weighing 43 lbs per roll. The coverage per roll is 9 1/4 squares. RoofTopGuard II is gray in color which helps reduce heat loads on attic structures.
5. Approvals Metro Dade County: Passed PA 104-95 Testing - NOA No.12-0426.01 Exp.06/14/17 ICC-ESR:2928 CAN/CSA: A220.1 Florida Building Code: 12145
6. Installation RoofTopGuard II must be installed above properly ventilated spaces (follow local building code) as it is considered a vapor barrier. RoofTopGuard II is laid horizontally (parallel) to the eave with the printed side up, and with 4" horizontal laps and 6" vertical laps. (The use of a slip sheet is not required underneath metal roofing.) RoofTopGuard II must be attached to the structural Roof Deck Material using Plastic or Steel Cap roofing nails, having a minimum of 1" diameter cap, spaced at 12" on vertical and 15" on horizontal. All Plastic, or Steel Caps, must be attached flush with the underlayment surface and nails must be fastened at a 90 degree angle to the deck. Prior to loading the roofing materials onto the RoofTopGuard product it is recommended that a roof jack, with planks, toe boards, or a strong platform be secured to the underlying roofing deck to prevent slippage of stored materials on steep sloped roofs (greater than 4 : 12 pitch). See OSHA regulations (Standard 29 CFR), fall protection systems criteria and practices – 1926.502. For batten secured applications, the use of plastic cap roofing nails required only to secure the underlayment and prevent blow off until the batten system is installed. Where seams or joints require sealant or adhesive, use only a high quality, low solvent asbestos free plastic roofing cement meeting ASTM D-4586 Type 1 (Asbestos Free), Spec SS-153 Type 1 (Asbestos Free). Installing final roofing within 6 months from initial underlayment application is recommended.
7. Technical Services RoofTopGuard II provides a 50 year limited material warranty. For warranty and technical information, go to www.rooftopguard.com.
8. Maintenance None when installed in accordance with manufacturer's recommendations.
|